Running settlement frame, compressing air with powerful capacity, equipment, and modern technology:
High-pressured air compressors, medium capacity air turbine (to 10 MW).
Low and medium capacity gas engine (to 3 MW)
Glycol dehydration drying air system.
Automatic directing and controlling system PLC, SCADA, DSC, Fire & Gas.
Maintaining and repairing devices:
Multi-capacity centrifugal air compressor 1,6 milion m3 per day speed 1000 rpm.
Air turbine engine (Sola Mars-100, Centaur-40)
Waukesha Gas Engine, Diesel engines.
Management and execution all gas technology projects:
Operating building investment and management projects on repairing and installing the projects of collecting and processing air compression. Operated Rang Dong – Bach Ho projects, Riser Block transform project.
Operating Precommissioning/Commissioning tasks, projects, devices.